The £5.45m scheme comprised of an extension and improvements for the existing promenade with enhanced public realm, pedestrian and cycle routes and the construction of primary and secondary defence walls.

Due to the coastal works encroaching on to the existing beach by approximately 40 meters, some of the work activities were carried out under tidal conditions, with controlled assessments to all beach and tidal works.

The flood defence is 470 meters in length and required standard protection designed for a 1 in 200 year storm with an allowance for 50 years of climate change.
 

Civils and Drainage Solution

The initial design was for a stepped revetment construction but was rejected by the Welsh Government for funding and a new design was approved using Marshalls Civils and Drainage's Redi-Rock modular walling blocks.

The construction of the coastal project has now been completed with the flood walls being successfully tested during the storms and high tides of November/December 2015.