With UK flooding events on the increase, Marshalls Civils & Drainage has designed a storm attenuation management flow control precast concrete manhole, for stormwater events at different peak levels, such as 1 in 20, 1 in 30 and 1 in 50-year storm events and suitable for any infrastructure, residential and commercial application.
In an innovative joint venture with Hydro International, this bespoke range of Hydro Brake Chambers with long-term flow control solutions are both quick and easy to install and are offered with a range of pre-fitted flow control components from 1200mm up to 3000mm chamber sections.
These flow control chambers are available with both standard access and special access cover slabs to ensure your site needs are met.
For handling information, please see the BPDA Manual Handling guide.
Benefits of Storm Attenuation Flow Control Chamber Solutions include: